Project: | Bold Camp Water System |
Location: | Pound, Virginia |
Description: | This project provides public water to 360 households in the Bold Camp section of Pound. It includes approximately 90,000 feet of 4″ to 8″ water line, a 100,000 gallon storage tank, and a mainline pressure reducing station. The project was funded from four federal and state agencies. The Bold Camp Water System is regionally interconnected with both the Wise County PSA (at Bold Camp Gap) and the town of Clintwood (at Red Onion Gap). |
Project Cost: | $ 3,195,000 |
Owner: | Town of Pound |
Bold Camp Water System